Used-equipment inspection technician

EmmaBennett0724

Emma Bennett

EB
North West EnglandJoined 19 Mar 202577 posts

About

Used-equipment inspection technician. Currently exploring welding cells and fixtures. Working around inconsistent part presentation; planning a 4-week trial before making a decision.

Welding cellsFixtures

Conversations

B

Separating fit-up, restraint and final inspection (Universal Robots UR5e)

BethChen1194 · 27 points · Applications & integration · 29 Aug 2026
7replies
J

Shifted supports and visible damage: where do I start? (placing assembly samples)

JamieBennett0730 · 9 points · Buying robots from China · 29 Aug 2026
20replies
A

The FR10 angle-bracket review needs the correction stage kept visible

AmaraAli0252 · 4 points · Applications & integration · 22 Aug 2026
18replies
M

Our inspection request disappears before the application observes it

MayaBell0649 · 1 points · Applications & integration · 17 Aug 2026
2replies
A

Checking real torch access around a steel gusseted bracket

AmyBrooks0815 · 14 points · Applications & integration · 12 Aug 2026
21replies
E

A small steel assemblies factory: What should count as dimensional acceptance after welding?

EmmaBennett0724 · 12 points · Applications & integration · 10 Aug 2026
11replies
I

Fairino FR5: Returned the gripper controller; now I can't confirm service intake

IsaacAbbott0085 · 35 points · Buying robots from China · 7 Aug 2026
9replies
A

How do I build a trustworthy reference set for a reflective aluminium bezel?

AlexBrooks0820 · 26 points · Programming & support · 3 Aug 2026
7replies
E

Final acceptance after correction still does not tell me the released bracket change

EllaBrown0903 · 30 points · Applications & integration · 31 Jul 2026
4replies
E

Too many convenient contacts in our nest drawing? (Fairino FR10, presenting mounting brackets for inspection)

EmmaBennett0724 · 1 points · Applications & integration · 18 Jul 2026
14replies
I

Which acknowledgement belongs to my retry? (Fairino FR5, part acceptance recording)

ImranAbbott0044 · 8 points · Programming & support · 18 Jul 2026
6replies
E

Which FR10 package does our confusing delivery receipt actually cover?

EmmaBennett0724 · 19 points · Buying robots from China · 23 Jun 2026
0replies
E

Which released bracket dimensions can I compare with our FR10 fixture notes?

EmmaBennett0724 · 6 points · Applications & integration · 18 Jun 2026
4replies
S

Would a stronger clamp hide a locating problem? (placing drilled components in an assembly fixture)

SamAli0246 · 12 points · Applications & integration · 5 Jun 2026
6replies
M

Universal Robots UR5e: Before we add restraint to a fixture we don't fully understand

MayaBell0649 · 17 points · Applications & integration · 1 Jun 2026
18replies
E

a gusseted steel support bracket weldment moves after release in our old inspection notes

EmmaBennett0724 · 15 points · Applications & integration · 29 May 2026
7replies
I

What counts as a confirmed defect on a reflective surface? (presenting reflective components for surface inspection)

ImranAdams0131 · 8 points · Programming & support · 28 May 2026
17replies
E

Universal Robots UR5e: Separating fit-up, restraint and final inspection

ElenaAli0253 · 40 points · Applications & integration · 28 May 2026
15replies
E

Fairino FR5: What counts as a confirmed defect on a reflective surface?

EllaAli0207 · 21 points · Programming & support · 14 May 2026
17replies
E

Which handover record should I ask for? (Fairino FR5, placing housings in trays)

EmmaBennett0724 · 5 points · Buying robots from China · 14 May 2026
0replies