Production planner for short-batch assembly

HenryChen1134

Henry Chen

HC
ScotlandJoined 19 Nov 202569 posts

About

Production planner for short-batch assembly. Currently exploring palletising and workshop projects. Working around a strict maintenance budget; planning a 6-week trial before making a decision.

PalletisingWorkshop projects

Conversations

N

Why are the support arrows absent from the layer plan?

NinaChan1110 · 5 points · Applications & integration · 4 Sept 2026
18replies
C

the UR5e panel is here, the applicable connection guide is not

ClaraBarnes0524 · 0 points · Buying robots from China · 20 Aug 2026
12replies
H

Who should assess the unsupported rotations in our FR10 dispatch layer?

HenryChen1134 · 12 points · Applications & integration · 18 Aug 2026
0replies
R

I taught the spacer job but left the recovery decisions with me

RaviBaker0476 · 9 points · Programming & support · 14 Aug 2026
11replies
L

Our offline FR10 screen gets approval from every imaginary method

LeahBrown0930 · 5 points · Programming & support · 13 Aug 2026
18replies
N

Which program do these pendant pictures actually describe? (inspection-cycle coordination)

NoahBaker0455 · 24 points · General robotics · 12 Aug 2026
5replies
A

A compact fixture loading station: Our tray-locating change still needs an honest assessment

AmaraAllen0339 · 22 points · Applications & integration · 6 Aug 2026
12replies
E

Before I sign off a pallet drawing full of neat rectangles (Fairino FR5, palletising sealed product cartons)

ElliotCarter1031 · 28 points · Applications & integration · 3 Aug 2026
2replies
N

Why does our FR5 mock accept every fixture-status mistake?

NathanChan1069 · 22 points · Programming & support · 31 Jul 2026
15replies
L

Can this alternating pattern support the load it arranges? - stacking packed cartons onto dispatch pallets

LeahBell0669 · 9 points · Applications & integration · 19 Jul 2026
16replies
S

Which drawings would connect carton support with gripper access? (stacking packed cartons onto dispatch pallets)

SarahBell0676 · 27 points · Applications & integration · 18 Jul 2026
11replies
H

A carton palletising project: Before I sign off a pallet drawing full of neat rectangles

HenryChen1134 · 29 points · Applications & integration · 17 Jul 2026
17replies
H

A packaged-products warehouse: Can this alternating pattern support the load it arranges?

HenryChen1134 · 26 points · Applications & integration · 10 Jul 2026
0replies
L

UR5e component-case layer has gaps below the required support

LucyArcher0393 · 12 points · Applications & integration · 3 Jul 2026
12replies
J

Rotated boxes over the layer gaps

JoBarnes0592 · 19 points · Applications & integration · 1 Jul 2026
1replies
T

How do I make our FR5 mock stop agreeing with every call?

TobyBrown0927 · 37 points · Programming & support · 17 Jun 2026
17replies
Y

A supervised assembly training cell: How do I help operators with an interrupted tray transfer job?

YasminCarter0963 · 38 points · Programming & support · 19 May 2026
6replies
D

A packaged-products warehouse: Our carton has a preferred support direction. The pattern rotates it.

DavidBarnes0606 · 38 points · Applications & integration · 8 May 2026
20replies
R

Who reconciles our carton supports with the finger gaps?

RosaBaker0466 · 30 points · Applications & integration · 6 May 2026
11replies
A

My UR5e first impression skipped the prepared fixture

AlexBennett0733 · 12 points · Reviews & comparisons · 18 Apr 2026
4replies