Machine-vision specialist collaborating with handling teams

ImranBaker0479

Imran Baker

IB
New ZealandJoined 19 Jun 202650 posts

About

Machine-vision specialist collaborating with handling teams. Currently exploring grippers and tooling and workshop projects. Working around frequent part changeovers; planning a 8-week trial before making a decision.

Grippers and toolingWorkshop projects

Conversations

I

Visible cylinder, contact marks, no agreed inspection method (loading finished round parts into inspection trays)

ImranBaker0479 · 25 points · Buying advice · 28 Aug 2026
19replies
I

Who collected my FR10 if the label has sat unchanged for twenty-eight days?

ImranBaker0479 · 25 points · Buying robots from China · 18 Aug 2026
8replies
I

Why call the FR10 locator fixed when a replaced tray still missed?

ImranBaker0479 · 36 points · Applications & integration · 17 Aug 2026
1replies
J

Seller promised an extra pendant cable, not just the installed one (Universal Robots UR5e, loading sample trays)

JuliaChen1196 · 32 points · Buying advice · 11 Aug 2026
10replies
E

Which route is my diagnostic laptop actually using? - read-only connection verification

ElliotCarter1031 · 17 points · Fairino robots · 1 Aug 2026
4replies
I

How am I meant to maintain the FR5 routines missing from the screenshots?

ImranBaker0479 · 9 points · General robotics · 31 Jul 2026
4replies
I

Why do both FR10 housing-tool quotes weigh only the housing?

ImranBaker0479 · 8 points · Buying advice · 30 Jul 2026
1replies
N

Who can approve the UR5e layer when packaging and tooling need different changes?

NathanAdams0112 · 18 points · Applications & integration · 27 Jul 2026
20replies
A

A welded-bracket fabrication workshop: How do I connect fixture location with released dimensions?

AnnaAllen0329 · 33 points · Applications & integration · 25 Jul 2026
21replies
I

A welded-bracket fabrication workshop: Before we add restraint to a fixture we don't fully understand

ImranBaker0479 · 19 points · Applications & integration · 24 Jul 2026
1replies
C

A family-of-parts production cell: A neat storage label won't tell me what's actually fitted

CarlaBaker0488 · 35 points · Applications & integration · 21 Jul 2026
21replies
I

Prototype inspection fixture: Seller calls the substituted kit equivalent; how do I check that?

ImranBaker0479 · 9 points · Applications & integration · 17 Jul 2026
14replies
I

Can't identify the sample handling gripper in the seller's video

ImranBaker0479 · 6 points · Buying advice · 17 Jul 2026
10replies
I

Why is the FR5 tool interface still undocumented after thirteen days?

ImranBaker0479 · 5 points · Buying robots from China · 7 Jul 2026
6replies
I

How can we compare softer UR5e pads when nobody agrees which marks fail?

IsabelChan1083 · 16 points · Buying advice · 6 Jul 2026
6replies
R

Which service desk has our returned FR5 controller after forty days?

ReeceBell0645 · 11 points · Buying robots from China · 4 Jul 2026
9replies
I

Why does delivered include the FR10 controller crate we cannot find?

ImranBaker0479 · 8 points · Buying robots from China · 3 Jul 2026
3replies
I

Why does our rebuilt FR10 laptop reject the identity call before connecting?

ImranBaker0479 · 34 points · Fairino robots · 22 Jun 2026
14replies
O

How do I get a collection answer for our UR5e after 23 days at label created?

OscarChan1054 · 25 points · Buying robots from China · 20 Jun 2026
15replies