Controls apprentice maintaining a training cell

MayaChen1171

Maya Chen

MC
WalesJoined 10 Dec 2024309 posts

About

Controls apprentice maintaining a training cell. Currently exploring plc integration and supplier support. Working around a strict maintenance budget; planning a 4-week trial before making a decision.

PLC integrationSupplier support

Conversations

J

ur5e spare filter still missing after fifty-two days of next shipment

JasperChen1160 · 25 points · Buying advice · 29 Jun 2026
10replies
J

How do I make our offline UR5e reporting mock capable of saying no?

JoAbbott0070 · 8 points · Programming & support · 27 Jun 2026
12replies
A

FR10 fixture access with an invisible gripper and open door

AmandaCampbell · 29 points · Fairino robots · 19 Jun 2026
15replies
L

Cannot attribute our FR10 display stalls to the busy log folder yet

LouisCarter1007 · 10 points · Programming & support · 16 Jun 2026
12replies
K

Why does this UR5e pallet picture give our carton ends nothing to sit on?

KaiArcher0367 · 16 points · Applications & integration · 14 Jun 2026
19replies
C

Which guide belongs with the tool interface supplied on our UR5e?

CarlaBaker0488 · 14 points · Buying robots from China · 13 Jun 2026
5replies
R

What belongs in a useful arrival condition report? (Fairino FR5)

RaviChen1172 · 17 points · Buying robots from China · 8 Jun 2026
17replies
J

Enough reach, incomplete drawing - machining fixture exchange

JuliaArcher0413 · 8 points · Fairino robots · 5 Jun 2026
18replies
M

Getting consistent inspection evidence before commissioning - inspecting reflective surfaces for scratches

MiaArcher0383 · 32 points · Programming & support · 29 May 2026
11replies
S

Not enough mounting adapter for the kits we planned (Universal Robots UR5e, changing sample handling fixtures)

SofiaChen1152 · 25 points · Buying advice · 27 May 2026
15replies
L

Intermittent stops while handling a rigid plastic housing: what should I capture? (Fairino FR5, fixture loading)

LouisAli0224 · 27 points · Buying robots from China · 25 May 2026
10replies
L

Enough reach, incomplete drawing - machine fixture loading

LiamArcher0403 · 24 points · Fairino robots · 22 May 2026
1replies
I

Separating fit-up, restraint and final inspection (Fairino FR5, defining dimensional control for bracket welding)

IsabelAli0213 · 30 points · Applications & integration · 15 May 2026
13replies
J

Our 67 starting batch doesn't answer the maintenance question (packing tray filling)

JackAli0254 · 2 points · Applications & integration · 10 May 2026
16replies
C

Dedicated parts handling station: How do I check whether this shipment left the seller?

CallumBrown0882 · 26 points · Buying robots from China · 4 May 2026
2replies
R

How do I make this robot support ticket actionable?

RachelAli0261 · 24 points · Buying robots from China · 4 May 2026
16replies
S

A welded-assemblies production workshop: Which geometry is missing from this welding-cell proposal?

SaraChen1157 · 27 points · Applications & integration · 1 May 2026
2replies
N

Our FR5 bracket correction has a duration but no matching first released check

NoahBrown0890 · 19 points · Applications & integration · 1 May 2026
4replies
T

The FR5 package label matches but the tool-interface guide describes different connections

ThomasArcher0364 · 3 points · Buying robots from China · 25 Apr 2026
19replies
R

Which FR5 tray-loading states should accompany our stationary-housing video?

RaviBarnes0563 · 25 points · Buying robots from China · 25 Apr 2026
11replies