Independent metrology consultant

SamBrown0942

Sam Brown

SB
MidlandsJoined 23 May 2025105 posts

About

Independent metrology consultant. Currently exploring fixtures and supplier support. Working around no spare production machine; planning a 3-week trial before making a decision.

FixturesSupplier support

Conversations

S

My offline robot mock says yes to everything (Fairino FR10)

SamBrown0942 · 21 points · Programming & support · 4 Sept 2026
1replies
A

Is alternating the layers actually right for our cartons? (Universal Robots UR5e, palletising sealed product cartons)

AmaraBaker0513 · 5 points · Applications & integration · 1 Sept 2026
21replies
Y

Separating reachability from the controller service (Fairino FR10, controller availability checking)

YasminArcher0354 · 37 points · Fairino robots · 30 Aug 2026
21replies
S

I cannot tell whether our FR10 screen has a value or merely a reply

SamBrown0942 · 8 points · Programming & support · 20 Aug 2026
18replies
J

Seller says split shipment, but there's no second reference (placing assembly inserts)

JoBennett0766 · 17 points · Buying advice · 8 Aug 2026
15replies
A

What should count as dimensional acceptance after welding? (defining dimensional control for bracket welding)

AdaChen1173 · 29 points · Applications & integration · 4 Aug 2026
12replies
S

I cannot reconcile 96 promised kits with the locating blocks in this box

SamBrown0942 · 2 points · Buying advice · 26 Jul 2026
4replies
A

Before I sign off a pallet drawing full of neat rectangles

AnikaBrooks0856 · 27 points · Applications & integration · 24 Jul 2026
8replies
A

A CNC turning workshop: planning a lathe load-and-unload sequence: one status, conflicting definitions

AaronBrown0871 · 32 points · Programming & support · 21 Jul 2026
16replies
H

A compact prototype production area: Support asked for more information. Which information?

HanaBell0622 · 10 points · Buying robots from China · 19 Jul 2026
21replies
S

Intermittent stops while handling a rigid plastic housing: what should I capture?

SamBrown0942 · 27 points · Buying robots from China · 18 Jul 2026
2replies
R

Our job label survived a restart a little too well (Fairino FR5, fixture inspection)

ReeceAdams0123 · 12 points · Programming & support · 17 Jul 2026
14replies
N

Universal Robots UR5e: The layer pattern fits, but some cartons sit over gaps

NinaArcher0414 · 33 points · Applications & integration · 15 Jul 2026
19replies
I

Cannot locate our FR10 diagnostic timeout between route and service

ImranCarter1001 · 3 points · Fairino robots · 7 Jul 2026
12replies
S

Turning a vague fault report into a useful support request - tray unloading

SamBrown0942 · 27 points · Buying robots from China · 2 Jun 2026
2replies
S

Intermittent stops while handling a molded connector body: what should I capture? (Fairino FR10, tray loading)

SamBrown0942 · 20 points · Buying robots from China · 30 May 2026
15replies
G

What should I send support about these intermittent Fairino FR5 stops? (tray loading)

GabrielAbbott0018 · 32 points · Buying robots from China · 28 May 2026
13replies
V

Fairino FR5: Before we add restraint to a fixture we don't fully understand

VictorCarter0968 · 2 points · Applications & integration · 1 May 2026
5replies
S

I cannot choose a useful UR5e capture from another stationary-sleeve video

SamBrown0942 · 24 points · Buying robots from China · 11 Apr 2026
2replies
C

Our FR5 stop video begins after the housing has left the fixture

ChenAdams0094 · 11 points · Buying robots from China · 9 Apr 2026
13replies