Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,716discussions

D

The same retained UR5e completion comes back as new after reconnect

DineshArcher0386 · 3 points · Applications & integration · 26 Jun 2026
20replies
J

Our FR5 torch line fits a corner the real torch may not

Jeremy_Carr · 27 points · Applications & integration · 26 Jun 2026
5replies
A

What does restrained alignment tell our FR5 bracket review?

AnnaChan1112 · 9 points · Applications & integration · 26 Jun 2026
1replies
L

Can our FR5 bracket study use final dimensions with the correction history missing?

LeahAllen0321 · 3 points · Applications & integration · 26 Jun 2026
10replies
T

Why does our UR5e corner-access claim depend on a torch with no body?

ThomasBrown0886 · 32 points · Applications & integration · 26 Jun 2026
0replies
S

Our 53-coupon progress count includes the coupons inspected again

SamAli0246 · 16 points · Applications & integration · 26 Jun 2026
6replies
M

How should I describe the spacer pickup improvement that did not survive a tray change?

MeiChan1125 · 28 points · Applications & integration · 26 Jun 2026
3replies
H

How do I assess the FR10 adapter that was never in our shell trial?

HanaBaker0448 · 11 points · Applications & integration · 26 Jun 2026
9replies
F

Our FR10 locator helped until the plastic-sleeve tray was replaced

FrancesCarr · 19 points · Applications & integration · 26 Jun 2026
0replies

One long-reach arm between two stations, or am I making a queue?

LeoAbbott0014 · 0 points · Applications & integration · 26 Jun 2026
3replies
C

Why is final bracket acceptance still being credited to our FR5 fixture idea?

ClaraAli0176 · 15 points · Applications & integration · 26 Jun 2026
21replies
O

Why give our UR5e bracket nest more clamp force before explaining its contacts?

OmarBell0665 · 17 points · Applications & integration · 26 Jun 2026
16replies
B

Why are we blaming the FR10 plan for spacers loaded by hand?

BenChen1153 · 36 points · Applications & integration · 26 Jun 2026
5replies
R

Which released bracket figures can our new UR5e fixture plan actually use?

RobinAllen0338 · 4 points · Applications & integration · 26 Jun 2026
10replies
C

Our UR5e panel tool seals, but the stack has not been part of the test

CeciliaCarr · 35 points · Applications & integration · 26 Jun 2026
11replies
B

Our coupon dashboard counts inspections towards a 197-item batch

BenAbbott0022 · 23 points · Applications & integration · 25 Jun 2026
10replies
A

I cannot price UR5e bracket correction from a final acceptance tick

AdaAllen0303 · 30 points · Applications & integration · 25 Jun 2026
5replies
M

Our FR5 locator result stops being fixed at the replacement tray

MayaCarter0997 · 36 points · Applications & integration · 25 Jun 2026
8replies
A

Our UR5e bracket plan has a restrained tick and an unexplained released failure

AdaAdams0129 · 30 points · Applications & integration · 25 Jun 2026
3replies
S

FR5 layer count is tidy. The rotated carton support is not explained

SeanCampbell · 19 points · Applications & integration · 25 Jun 2026
3replies