Research laboratory equipment coordinator

AdaAdams0129

Ada Adams

AA
WalesJoined 16 Mar 2025166 posts

About

Research laboratory equipment coordinator. Currently exploring supplier support and fixtures. Working around inconsistent part presentation; planning a 11-week trial before making a decision.

Supplier supportFixtures

Conversations

I

Which old measurements can actually guide our fixture review? (reviewing fixtures for welded mounting brackets)

IsaacCarter1042 · 8 points · Applications & integration · 26 May 2026
21replies
H

Who should combine the FR5 gripper and mill-door geometry?

HazelAli0223 · 11 points · Fairino robots · 9 May 2026
21replies
A

Separating fit-up, restraint and final inspection - defining dimensional control for bracket welding

AnikaBrooks0856 · 13 points · Applications & integration · 5 May 2026
13replies
A

A compact prototype production area: Still waiting for useful help with tray unloading

AdaAdams0129 · 12 points · Buying robots from China · 2 May 2026
8replies
H

Why does our FR10 spacer ticket keep returning a trace from another run?

HassanAdams0095 · 24 points · Buying robots from China · 28 Apr 2026
12replies
O

Getting consistent inspection evidence before commissioning (Fairino FR10)

OscarAdams0097 · 36 points · Programming & support · 27 Apr 2026
10replies
C

Our bracket pass uses a different checking support from the failure

CalebArcher0406 · 16 points · Applications & integration · 27 Mar 2026
11replies
A

What more information do they want from the same stopped FR5?

AmyBrown0902 · 35 points · Buying robots from China · 25 Mar 2026
4replies
C

Are these bracket readings even measured from the same face?

CarlaAbbott0053 · 4 points · Applications & integration · 19 Mar 2026
19replies
R

Our FR10 connector trace has more detail than the video and nobody has decoded it

RosaCarter0988 · 10 points · Buying robots from China · 18 Mar 2026
12replies
A

The released bracket fails, but the final pass has no correction entry

AdaAdams0129 · 31 points · Applications & integration · 16 Mar 2026
10replies
A

The restrained bracket check measures a different feature

AdaAdams0129 · 7 points · Applications & integration · 11 Mar 2026
8replies
O

our fr10 connector ticket needs the event before the tray wait

OmarBrooks0839 · 31 points · Buying robots from China · 2 Mar 2026
8replies
A

Our bezel image changes when the support insert is exchanged

AdaAdams0129 · 9 points · Programming & support · 24 Feb 2026
9replies
A

Our bracket baseline changes when the checking fixture is changed

AdaAdams0129 · 20 points · Applications & integration · 21 Feb 2026
10replies
F

our ur5e connector job gets its receipt and still waits

FionaBarnes0586 · 0 points · Buying robots from China · 8 Feb 2026
6replies
O

fr5 wait says tray full when it isn't

OscarAllen0271 · 32 points · Buying robots from China · 7 Feb 2026
14replies
A

The FR10 bracket estimate gives a witness mark the weight of an inspection

AdaAdams0129 · 13 points · Applications & integration · 9 Jan 2026
12replies
A

Our FR5 bracket proposal skips the released check before correction

AnnaAllen0329 · 11 points · Applications & integration · 7 Jan 2026
2replies
D

Cannot choose our UR5e pattern while the manual exception keeps growing

DavidBarnes0606 · 6 points · Applications & integration · 3 Jan 2026
18replies