Technical college instructor maintaining a teaching cell

AishaBaker0518

Aisha Baker

AB
South West EnglandJoined 9 Nov 202589 posts

About

Technical college instructor maintaining a teaching cell. Currently exploring workshop projects and fixtures. Working around limited floor space; planning a 20-week trial before making a decision.

Workshop projectsFixtures

Conversations

M

The fixture holds nominal shape. What happens after release? (Fairino FR5)

MayaAbbott0040 · 10 points · Applications & integration · 26 May 2026
12replies
A

The fixture holds nominal shape. What happens after release? - planning repeatable welding of bracket assemblies

AishaBaker0518 · 11 points · Applications & integration · 16 May 2026
14replies
A

The payload argument stops at the part. Mine doesn't. (Fairino FR5)

AishaBaker0518 · 7 points · Buying advice · 12 May 2026
17replies
A

A robotic welding project review: Our weldment looks aligned until it comes out of the fixture

AishaBaker0518 · 4 points · Applications & integration · 11 May 2026
4replies
A

Which old measurements can actually guide our fixture review? (preparing robotic welding of gusseted brackets)

AishaBaker0518 · 36 points · Applications & integration · 25 Apr 2026
2replies
I

What should count as dimensional acceptance after welding?

IsaacCarter1042 · 8 points · Applications & integration · 15 Apr 2026
11replies
A

Before we add restraint to a fixture we don't fully understand (defining dimensional control for bracket welding)

AishaBaker0518 · 32 points · Applications & integration · 14 Apr 2026
4replies
A

Our FR5 startup offers to repeat the inspection whose result it lost

AishaBaker0518 · 9 points · Programming & support · 5 Apr 2026
17replies
A

Our FR10 housing quote apparently carries the fingers for free

AishaBaker0518 · 19 points · Buying advice · 23 Mar 2026
0replies
A

Why does our bracket's released check use a different support from the drawing?

AnnaChan1112 · 21 points · Applications & integration · 15 Mar 2026
6replies
J

our 224 brackets have more passes than accepted items

JackAli0254 · 8 points · Applications & integration · 5 Mar 2026
8replies
A

Our bracket study charges fixture setup to each corrected piece

AishaBaker0518 · 12 points · Applications & integration · 9 Feb 2026
13replies
E

our fr5 report gives a bracket another acceptance after its retry

EmmaAdams0115 · 9 points · Applications & integration · 1 Feb 2026
12replies
A

Our FR5 handover skips the routine that decides which plate recipe runs

AishaBaker0518 · 26 points · General robotics · 13 Jan 2026
0replies
A

Our bracket's green inspection column includes the ones sent for correction

AishaBaker0518 · 17 points · Applications & integration · 3 Jan 2026
11replies
A

Our bracket's best measurement was taken while it could not move

AishaBaker0518 · 5 points · Applications & integration · 15 Dec 2025
6replies
S

Our FR5 sleeves lean after the pickup corrections

SarahAdams0154 · 36 points · General robotics · 9 Nov 2025
21replies