Technical college instructor maintaining a teaching cell

AmaraAbbott0078

Amara Abbott

AA
MidlandsJoined 8 Jul 202657 posts

About

Technical college instructor maintaining a teaching cell. Currently exploring workshop projects and grippers and tooling. Working around limited floor space; planning a 12-week trial before making a decision.

Workshop projectsGrippers and tooling

Conversations

L

Testing duplicate and reordered events for Fairino FR10 (inspection result reconciliation)

LeoArcher0362 · 12 points · Programming & support · 4 Sept 2026
12replies
A

Our handling budget left out fixture work and staff time (Universal Robots UR5e, tray loading)

AmaraAbbott0078 · 24 points · Buying advice · 3 Sept 2026
12replies
A

How do I trace the missing controller and the teach pendant cable? (loading assembly fixtures)

AmaraAbbott0078 · 19 points · Buying advice · 3 Sept 2026
17replies
E

How do I keep an uncertain attempt out of automatic resubmission? (Fairino FR5)

EllaChan1077 · 21 points · Programming & support · 2 Sept 2026
21replies
A

One crate arrived; the rest of the order has no tracking (Universal Robots UR5e, placing assembly inserts)

AmaraAbbott0078 · 17 points · Buying advice · 26 Aug 2026
8replies
L

Our UR5e handover uses ready for two different ordinary events

LeoArcher0362 · 6 points · Programming & support · 23 Aug 2026
16replies
A

Detailed FR10 logging coincides with a display stuck on an old reading

AmaraAbbott0078 · 22 points · Programming & support · 23 Aug 2026
3replies
A

Six days of next shipment for the extra FR10 tool cable

AmaraAbbott0078 · 20 points · Buying advice · 21 Aug 2026
19replies
A

Which FR5 attempt owns the acknowledgement after our label was reused?

AmaraAbbott0078 · 3 points · Programming & support · 20 Aug 2026
10replies
J

Our UR5e request pulse is brief, but the ownership gap is the bigger handover problem

JasperBrooks0812 · 8 points · Applications & integration · 20 Aug 2026
19replies
A

How do I get past 'next shipment' replies?

AmaraAbbott0078 · 12 points · Buying advice · 13 Aug 2026
0replies
A

Freight says delivered, but one of our crates isn't here (Universal Robots UR5e, transferring lightweight housings)

AmaraAbbott0078 · 9 points · Buying robots from China · 12 Aug 2026
2replies
A

What should count as dimensional acceptance after welding? (Fairino FR10)

AmaraAbbott0078 · 31 points · Applications & integration · 11 Aug 2026
1replies
A

Sealed box, incomplete kits, disputed quantity (Universal Robots UR5e, preparing molded part handling runs)

AmaraAbbott0078 · 25 points · Buying advice · 11 Aug 2026
15replies
L

What should go into the load review for Universal Robots UR5e?

LucaBennett0700 · 27 points · Buying advice · 10 Aug 2026
10replies
A

A shared parts handling bench: Pick, place, advance: the interruption is where we get lost

AmaraAbbott0078 · 29 points · Programming & support · 10 Aug 2026
3replies
A

Reviewing a reversible insert before we approve the setup (Fairino FR10)

AmaraAbbott0078 · 10 points · Applications & integration · 5 Aug 2026
1replies
A

What should I ask after an unconfirmed gripper-kit substitution? (Fairino FR5, placing small plastic samples in trays)

AmaraAbbott0078 · 15 points · Applications & integration · 1 Aug 2026
1replies
A

Does a warehouse reference mean the robot is there? (loading inspection fixtures)

AmaraAbbott0078 · 32 points · Buying robots from China · 23 Jul 2026
0replies
D

Buying for handling a small aluminum block, unsure what has been checked (Fairino FR10)

DanielAllen0304 · 12 points · Buying advice · 21 Jul 2026
11replies