Factory network administrator

BrunoArcher0365

Bruno Archer

BA
IrelandJoined 25 Aug 2025127 posts

About

Factory network administrator. Currently exploring vision inspection and workshop projects. Working around a strict maintenance budget; planning a 15-week trial before making a decision.

Vision inspectionWorkshop projects

Conversations

N

A supervised parts transfer bench: What should I report about this incomplete parts tray unloading improvement?

NadiaBaker0465 · 37 points · Applications & integration · 31 Aug 2026
16replies
K

A low-volume assembly workshop: Starting with 226: what belongs in the pilot budget?

KaiCarter0976 · 34 points · Buying advice · 30 Aug 2026
6replies
L

A small owner-run workshop: What should a small fixture loading pilot prove?

LeoArcher0362 · 27 points · Buying advice · 26 Aug 2026
6replies
S

How do I compare FR5 exchange access when the door and hand are absent?

SarahAbbott0067 · 0 points · Fairino robots · 24 Aug 2026
10replies
B

Our bezel scratches travel when the camera presentation changes

BrunoArcher0365 · 31 points · Programming & support · 20 Aug 2026
15replies
L

Universal Robots UR5e: Our nest insert can apparently go in backwards

LinAllen0270 · 4 points · Applications & integration · 14 Aug 2026
2replies
C

FR5 diagnostic timeout with no usable record of the working laptop

CallumArcher0360 · 39 points · Fairino robots · 13 Aug 2026
4replies
M

A fixture point isn't the whole machine-tending approach - machine fixture unloading

MayaParts · 7 points · Fairino robots · 2 Aug 2026
10replies
C

Our FR10 bezel labels call a travelling highlight a scratch

ChenChan1051 · 29 points · Programming & support · 31 Jul 2026
10replies
N

I have UR5e screenshots but no defensible handover revision

NinaBrown0936 · 18 points · General robotics · 27 Jul 2026
19replies
B

How do I build a trustworthy reference set for a bright-finished enclosure faceplate?

BrunoArcher0365 · 35 points · Programming & support · 24 Jul 2026
1replies
B

One item, several inspections, an inflated total (sample verification)

BrunoArcher0365 · 10 points · Applications & integration · 15 Jul 2026
13replies
G

A low-volume CNC workshop: Our chuck-loading plan has a measurement problem

GraceArcher0407 · 29 points · Applications & integration · 9 Jul 2026
4replies
H

Inside-corner clearance missing from the FR10 welding sketch

HassanBennett0704 · 23 points · Applications & integration · 29 Jun 2026
13replies
O

FR10 completion already high, reconnect counter says another housing finished

OmarCarter1013 · 0 points · Applications & integration · 27 Jun 2026
21replies
R

The UR5e price was easy; nobody priced unloading the fixture around it

RaviChen1172 · 9 points · Buying advice · 18 Jun 2026
17replies
M

our UR5e tooling offers have weighed the housing and forgotten the assembly

MiaAli0209 · 19 points · Buying advice · 16 Jun 2026
8replies
B

Bright streaks move when we present the part differently (planning camera inspection of reflective parts)

BrunoArcher0365 · 33 points · Programming & support · 5 Jun 2026
10replies
D

Manual inspection bench: Our Universal Robots UR5e arrived, but the promised spare kit didn't

DanielBarnes0565 · 14 points · Buying advice · 31 May 2026
10replies
I

What counts as a confirmed defect on a reflective surface? (presenting reflective components for surface inspection)

ImranAdams0131 · 8 points · Programming & support · 28 May 2026
17replies