Independent integrator supporting inherited cells

JamieBarnes0556

Jamie Barnes

JB
GermanyJoined 26 Jul 2025214 posts

About

Independent integrator supporting inherited cells. Currently exploring machine tending and fixtures. Working around an ageing control cabinet; planning a 13-week trial before making a decision.

Machine tendingFixtures

Conversations

G

The finished blank clears, the second jaw might not

GabrielBarnes0540 · 32 points · Fairino robots · 4 Sept 2026
11replies
D

What should replace this bare-arm FR5 loading sketch?

DineshAllen0299 · 19 points · Fairino robots · 28 Aug 2026
14replies
S

A precision metal-parts inspection area: Universal Robots UR5e inspection plan: scratches or changing reflections?

SaraAdams0113 · 32 points · Programming & support · 26 Aug 2026
20replies
Z

Which FR10 layer view tests the support under our rotated product boxes?

ZaraCarter1004 · 22 points · Applications & integration · 24 Aug 2026
5replies
J

FR10 brass-loading sketch gives no space to the actual hand

JamieBarnes0556 · 12 points · Fairino robots · 21 Aug 2026
3replies
J

the UR5e unloading report is old but the event evidence is thin

JonasBaker0459 · 19 points · Buying robots from China · 15 Aug 2026
21replies
J

Why does the documented FR5 read time out when another laptop once worked?

JuliaAli0239 · 13 points · Fairino robots · 14 Aug 2026
10replies
E

a steel gusseted bracket assembly moves after release in our old inspection notes (Universal Robots UR5e)

EmmaBrown0898 · 17 points · Applications & integration · 13 Aug 2026
13replies
S

Does our machine-tending layout actually fit the complete tool? (machine fixture unloading)

SarahAbbott0067 · 23 points · Fairino robots · 11 Aug 2026
8replies
Z

Checking the nest before agreeing to more clamp force (Fairino FR10)

ZaraCarter1004 · 7 points · Applications & integration · 10 Aug 2026
11replies
S

A workshop status-monitoring station: A plausible status from a failed request

SamChan1116 · 11 points · Programming & support · 7 Aug 2026
4replies
V

Fifteen days at label created for our FR10 inspection-tray order

VictoriaCasey · 22 points · Buying robots from China · 30 Jul 2026
1replies
R

I cannot schedule the 29-blank FR5 proposal from its reachable fixture point

RosaBrooks0814 · 30 points · Fairino robots · 28 Jul 2026
12replies
E

One ready word is hiding two events in my FR10 interface notes

Eli_Casey · 16 points · Programming & support · 28 Jul 2026
4replies
K

Why is our UR5e dashboard nearly finished when it is counting retries?

KaiArcher0367 · 33 points · Applications & integration · 27 Jul 2026
2replies
N

Our open machine door is missing from the layout (Fairino FR5)

NoahAllen0281 · 22 points · Fairino robots · 21 Jul 2026
10replies
I

Fairino FR10: Before we add restraint to a fixture we don't fully understand

ImranCarter1001 · 29 points · Applications & integration · 15 Jul 2026
20replies
S

FR10 polymer-blank loading sketch without the open door

Simon_Carr · 16 points · Fairino robots · 29 Jun 2026
8replies
B

FR10 read-only script stranded between SDK folders

BrunoAllen0278 · 36 points · Fairino robots · 28 Jun 2026
7replies
D

Why does our FR10 torch-access review stop at a line reaching the seam?

DineshBennett0734 · 7 points · Applications & integration · 24 Jun 2026
5replies