Research laboratory equipment coordinator

KaiBrown0889

Kai Brown

KB
New ZealandJoined 9 Feb 2025166 posts

About

Research laboratory equipment coordinator. Currently exploring fairino robots and fixtures. Working around a strict maintenance budget; planning a 10-week trial before making a decision.

Fairino robotsFixtures

Conversations

A

Tracking a rigid molded spacer through an interrupted transfer (tray-to-fixture transfer)

AaronAllen0262 · 11 points · Programming & support · 4 Sept 2026
11replies
B

I don't want another coordinate tweak to be our maintenance plan - tray-to-fixture transfer

BrunoBarnes0539 · 19 points · General robotics · 28 Aug 2026
4replies
D

My UR5e alignment adapter is not the interface confirmed before purchase

DavidBell0693 · 26 points · Buying advice · 17 Aug 2026
11replies
A

FR10 verification sent before crash, startup still wants to send it again

AdamChambers · 36 points · Programming & support · 15 Aug 2026
1replies
O

The tray looks fixed, but the grip looks crooked (Fairino FR10)

OwenChan1095 · 17 points · General robotics · 7 Aug 2026
6replies
E

Fairino FR5: defining dimensional control for bracket welding: held straight and finished straight aren't the same check

EmmaBell0637 · 28 points · Applications & integration · 5 Aug 2026
15replies
E

Documenting part inspection while the integrator is still available

EmmaAli0202 · 29 points · General robotics · 3 Aug 2026
8replies
J

Small sample handling bench: Our loading small inspection fixtures demonstration leaves the tooling out of view

JuliaAli0239 · 17 points · Buying advice · 25 Jul 2026
11replies
Z

Working on read-only controller reporting while our cell is unavailable (Fairino FR10)

ZaraBennett0743 · 26 points · Programming & support · 13 Jul 2026
4replies
H

planning repeatable bracket location: what should locate the part and what should only support it?

HazelChen1180 · 28 points · Applications & integration · 10 Jul 2026
18replies
L

How should our UR5e bezel reference distinguish a true scratch from a moving band?

LucaBrooks0787 · 31 points · Programming & support · 3 Jul 2026
19replies
R

Our bezel photos have travelling streaks and very stationary scratch labels

RaviArcher0389 · 30 points · Programming & support · 25 Jun 2026
3replies
B

How do I stop another FR10 sleeve offset becoming the maintenance answer?

BenBrown0892 · 17 points · General robotics · 24 Jun 2026
7replies
O

Our spare kit keeps being pushed into an unspecified shipment (Universal Robots UR5e, placing parts in assembly nests)

OliverBrown0885 · 29 points · Buying advice · 7 Jun 2026
18replies
K

How much of Universal Robots UR5e's interface should I mock? - read-only controller reporting

KaiBrown0889 · 25 points · Programming & support · 6 Jun 2026
3replies
V

Universal Robots UR5e: Our grouping lightweight test pieces setup is waiting on an unconfirmed dispatch

VictorCarter0968 · 1 points · Buying robots from China · 5 Jun 2026
2replies
A

A supervised tray handling cell: Tracking a polymer sleeve through an interrupted transfer

AnnaBaker0503 · 40 points · Programming & support · 4 Jun 2026
3replies
B

A complete robot delivery with one unfinished spare-kit promise (Fairino FR10, sorting inspection samples)

BenAli0196 · 8 points · Buying advice · 1 Jun 2026
13replies
C

two unsupported positions in our fr10 layer draft

ChloeAdams0135 · 25 points · Applications & integration · 6 May 2026
6replies
A

Where do I start with a claimed separate controller shipment? (positioning assembly samples)

AnilAbbott0027 · 9 points · Buying advice · 13 Apr 2026
2replies