Application safety assessor

MayaBarnes0562

Maya Barnes

MB
AustraliaJoined 16 May 2025278 posts

About

Application safety assessor. Currently exploring fixtures and plc integration. Working around a strict maintenance budget; planning a 3-week trial before making a decision.

FixturesPLC integration

Conversations

I

The layer pattern fits, but some cartons sit over gaps (Fairino FR5)

IsabelAllen0300 · 18 points · Applications & integration · 3 Sept 2026
8replies
M

How do I make this robot support ticket actionable? (fixture loading)

MinaAllen0337 · 17 points · Buying robots from China · 2 Sept 2026
9replies
L

Lightweight assembly fixture: Am I asking too much by wanting an identifiable demonstration?

LucaBrown0874 · 11 points · Buying advice · 1 Sept 2026
6replies
M

Which released bracket belongs to our aligned-in-fixture note?

MayaBarnes0562 · 10 points · Applications & integration · 25 Aug 2026
0replies
E

Two sleeve demos, two tray conditions, no fair shortlist yet

Evan_Chambers · 28 points · Buying advice · 24 Aug 2026
5replies
C

Stationary tray, crooked spacer grip, more saved pickup edits

CallumAdams0099 · 21 points · General robotics · 24 Aug 2026
14replies
O

Seven days waiting for the UR5e bracket interface comparison

OmarBell0665 · 29 points · Buying advice · 22 Aug 2026
8replies
J

Our FR5 inspection request disappears between observations and nobody owns the clearing rule

JamieBennett0730 · 22 points · Applications & integration · 20 Aug 2026
10replies
D

FR10 polymer-blank removal still lacks the supplier's half of the access view

DanielAllen0304 · 20 points · Fairino robots · 17 Aug 2026
7replies
R

The UR5e spacer ticket has outlasted the usefulness of its first phone clip

RaviBarnes0563 · 28 points · Buying robots from China · 17 Aug 2026
8replies
J

What carries over from the FR10 sample trial when the adapter changes?

JamieBennett0730 · 19 points · Applications & integration · 14 Aug 2026
4replies
C

Separating fit-up, restraint and final inspection

CalebAdams0145 · 16 points · Applications & integration · 13 Aug 2026
12replies
C

A lathe automation planning area: planning repeatable axial chuck loading: the hand-loaded samples already disagree

CalebAdams0145 · 34 points · Applications & integration · 9 Aug 2026
2replies
Y

How do I connect weld requirements with the cell layout? (Fairino FR10)

YasminBrown0876 · 11 points · Applications & integration · 3 Aug 2026
1replies
J

What should packaging approve for stacking a packed rectangular product box? (Fairino FR10)

JoBarnes0592 · 29 points · Applications & integration · 2 Aug 2026
10replies
K

How representative is one good vacuum sample? (Fairino FR10, transferring closed cartons between packing stations)

KaiArcher0367 · 16 points · Applications & integration · 14 Jul 2026
1replies
V

What should a changeover prove before automated use? - loading rigid components into interchangeable nests

VictorBarnes0533 · 17 points · Applications & integration · 13 Jul 2026
2replies
C

Seller says handed over, freight agent says not received - loading inspection fixtures

ClaraBennett0698 · 19 points · Buying robots from China · 13 Jul 2026
8replies
I

Lightweight inspection cell: Returned the tool interface module; now I can't confirm service intake

IsaacChan1129 · 29 points · Buying robots from China · 9 Jul 2026
1replies
N

fr5 case layers need bearing regions behind the arrows

NoahBrooks0803 · 21 points · Applications & integration · 3 Jul 2026
11replies