Equipment reuse and repair coordinator

TheoCarter1019

Theo Carter

TC
ScotlandJoined 22 Nov 202583 posts

About

Equipment reuse and repair coordinator. Currently exploring buying robots from china and palletising. Working around multiple shifts; planning a 18-week trial before making a decision.

Buying robots from ChinaPalletising

Conversations

E

What should packaging approve for stacking a packed rectangular product box?

EllaAbbott0033 · 11 points · Applications & integration · 3 Sept 2026
15replies
C

Fairino FR10: Can this alternating pattern support the load it arranges?

ChenChen1138 · 0 points · Applications & integration · 3 Sept 2026
21replies
W

Fairino FR10: Our planned batch is 8; the demonstration covered one finish

WillChen1183 · 29 points · Applications & integration · 3 Sept 2026
10replies
A

Softer FR10 collar pads proposed before anyone has agreed the appearance check

AnilBennett0723 · 23 points · Buying advice · 20 Aug 2026
21replies
R

The FR5 bezel labels need physical decisions before my repeat-image comparison

RobinAdams0164 · 30 points · Programming & support · 18 Aug 2026
16replies
O

cast housing weighed, extended FR10 tool left out of both offers

OliverBennett0711 · 12 points · Buying advice · 15 Aug 2026
6replies
T

Fairino FR10: Is alternating the layers actually right for our cartons?

TheoCarter1019 · 2 points · Applications & integration · 11 Aug 2026
7replies
T

What support finding belongs beside this UR5e carton pattern?

TheoCarter1019 · 17 points · Applications & integration · 28 Jul 2026
3replies
T

Which drawings would connect carton support with gripper access?

TheoCarter1019 · 24 points · Applications & integration · 8 Jul 2026
2replies
K

Why are we choosing the FR10 hand before explaining the carton gaps?

KaiArcher0367 · 5 points · Applications & integration · 7 Jul 2026
8replies
T

Cannot accept a UR5e layer pattern without the case support requirement

TheoCarter1019 · 32 points · Applications & integration · 6 Jul 2026
2replies
R

Our FR5 sleeve plan uses ready for receipt and availability

RobinCarter1034 · 25 points · Programming & support · 27 Jun 2026
18replies
T

Can this alternating pattern support the load it arranges?

TheoCarter1019 · 15 points · Applications & integration · 3 Jun 2026
3replies
T

Reviewing a missed request without confusing it with rejection (Fairino FR10, fixture inspection)

TheoCarter1019 · 24 points · Applications & integration · 30 May 2026
7replies
E

Which drawings would connect carton support with gripper access?

ElliotBaker0509 · 25 points · Applications & integration · 16 May 2026
10replies
T

How do I assess a tidy pattern with questionable support? (arranging shipping cartons in pallet layers)

TheoCarter1019 · 24 points · Applications & integration · 16 May 2026
1replies
T

I cannot maintain our FR5 inspection routine from pictures of its main page

TheoCarter1019 · 3 points · General robotics · 1 May 2026
0replies
T

Our handover taught startup and skipped recovery (Universal Robots UR5e, tray transfer)

ThomasArcher0364 · 10 points · Programming & support · 21 Apr 2026
14replies
T

I cannot accept the FR10 turned row while its carton ends bridge the gaps

TheoCarter1019 · 6 points · Applications & integration · 14 Mar 2026
20replies
O

Why does ready mean receipt to one UR5e supplier and availability to the other?

OliverAdams0102 · 31 points · Programming & support · 4 Mar 2026
19replies