Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,717discussions

P

How do I compare delivered tooling with the agreed sample setup? (Universal Robots UR5e)

PriyaAbbott0046 · 18 points · Applications & integration · 3 May 2026
16replies
A

Fairino FR10: Which old measurements can actually guide our fixture review?

AmyAdams0119 · 28 points · Applications & integration · 2 May 2026
2replies
M

How do I link our FR5 bracket correction to its released failure?

MeiBrooks0864 · 18 points · Applications & integration · 2 May 2026
1replies
N

Why is our UR5e turned carton called supported before the tool leaves?

NinaChan1110 · 3 points · Applications & integration · 2 May 2026
1replies
R

Our FR10 carton section omits the lower case beside the fingers

RosaAli0205 · 6 points · Applications & integration · 2 May 2026
7replies
T

Why accept our FR10 carton count while the turned bearing strip has no support?

TobyAbbott0057 · 16 points · Applications & integration · 2 May 2026
1replies
A

How do I decide whether our UR5e refill transfer deserves another guide?

AnilBarnes0549 · 31 points · Applications & integration · 2 May 2026
0replies
C

Fairino FR5: Separating fit-up, restraint and final inspection

CarlaAli0227 · 17 points · Applications & integration · 2 May 2026
0replies
A

a steel gusseted bracket assembly moves after release in our old inspection notes

AnnaArcher0416 · 32 points · Applications & integration · 2 May 2026
2replies
A

Fairino FR10: Before we add restraint to a fixture we don't fully understand

AaronAdams0088 · 18 points · Applications & integration · 2 May 2026
1replies
I

Fairino FR10: a gusseted steel support bracket weldment moves after release in our old inspection notes

IsaacBaker0520 · 12 points · Applications & integration · 2 May 2026
2replies
V

Fairino FR5: Before we add restraint to a fixture we don't fully understand

VictorCarter0968 · 2 points · Applications & integration · 1 May 2026
5replies
T

Fairino FR5: Our vacuum report covers sealing; what should cover flexing?

TobyBrown0927 · 12 points · Applications & integration · 1 May 2026
1replies
C

Is alternating the layers actually right for our cartons?

CarlaChen1184 · 18 points · Applications & integration · 1 May 2026
1replies
R

What should count as dimensional acceptance after welding?

RobinAllen0338 · 18 points · Applications & integration · 1 May 2026
10replies
W

How do I tie the installed insert to the right recipe? (Fairino FR5)

WillAli0226 · 20 points · Applications & integration · 1 May 2026
10replies
S

A welded-assemblies production workshop: Which geometry is missing from this welding-cell proposal?

SaraChen1157 · 27 points · Applications & integration · 1 May 2026
2replies
H

Our FR10 bracket pass includes work nobody put in the quote

HenryBrooks0786 · 38 points · Applications & integration · 1 May 2026
6replies
L

I cannot price FR10 bush loading from exposed length alone

LouisBennett0746 · 15 points · Applications & integration · 1 May 2026
10replies
B

Our FR5 dispatch-carton tool leaves its bearing strip over a gap

BrunoBrooks0800 · 16 points · Applications & integration · 1 May 2026
4replies