Laboratory researcher automating sample handling

AaronAli0175

Aaron Ali

AA
South West EnglandJoined 20 Dec 202551 posts

About

Laboratory researcher automating sample handling. Currently exploring grippers and tooling and python sdks. Working around multiple shifts; planning a 11-week trial before making a decision.

Grippers and toolingPython SDKs

Conversations

J

How do I make this robot support ticket actionable? (Fairino FR5)

JaneAbbott0075 · 32 points · Buying robots from China · 27 Aug 2026
17replies
R

Unidentifiable FR10 film leaves my agreed pad demonstration unfulfilled

RebeccaBennett0778 · 21 points · Buying advice · 24 Aug 2026
21replies
S

the brass blank reaches the fixture only in an incomplete FR5 drawing

StephanieChambers · 30 points · Fairino robots · 17 Aug 2026
20replies
A

A fixture point isn't the whole machine-tending approach - machine fixture loading

AdaCarter0999 · 14 points · Fairino robots · 9 Aug 2026
20replies
R

Am I measuring the blank or the seating error? (Fairino FR5)

RosaCarter0988 · 26 points · Applications & integration · 7 Aug 2026
20replies
A

Different the tool connection adapter, no application evidence

AaronAli0175 · 3 points · Applications & integration · 15 Jul 2026
21replies
A

Our 53 dispatch cartons include seams the FR10 vacuum demo avoided

AaronAli0175 · 0 points · Applications & integration · 27 Jun 2026
8replies
A

An empty tray pocket sends the UR5e operators back to me

AaronAli0175 · 15 points · Programming & support · 9 Jun 2026
1replies
A

Bought against a drawing; received a different-looking interface (loading lightweight housings)

AaronAli0175 · 27 points · Buying advice · 17 May 2026
6replies
D

A workshop tray handling cell: I think our instructions are the problem, not operator attitude

DavidBrooks0867 · 32 points · Programming & support · 26 Apr 2026
21replies
L

Why does our bezel reference get a different judgement from each inspector?

LouisChan1094 · 36 points · Programming & support · 6 Mar 2026
11replies
A

The FR5 comparison changes both the arm and the puck tray

AaronAli0175 · 14 points · Buying advice · 22 Feb 2026
2replies
A

Our FR10 report counts the retained PLC high again

AaronAli0175 · 10 points · Applications & integration · 17 Feb 2026
2replies
A

Our delivered UR5e arm has a crushed support beside the connector housing

AaronAli0175 · 5 points · Buying robots from China · 7 Feb 2026
14replies
A

Our UR5e arm is here and the controller shipment has no package mark

AaronAli0175 · 18 points · Buying advice · 4 Feb 2026
3replies
O

our fr10 loading sketch loses the air fitting at the doorway

OwenArcher0399 · 17 points · Fairino robots · 2 Feb 2026
20replies
G

I can't price our FR5 pallet pattern while its bottom support is imaginary

GabrielChen1149 · 15 points · Applications & integration · 30 Jan 2026
16replies
J

How many more UR5e stop clips before support asks the PLC owner?

Jules_Blair · 21 points · Buying robots from China · 30 Dec 2025
16replies
A

Our UR5e restart remembers a pocket but not the tray it belonged to

AaronAli0175 · 10 points · Programming & support · 20 Dec 2025
19replies