Production planner for short-batch assembly

AnikaAllen0334

Anika Allen

AA
CanadaJoined 17 Jan 202650 posts

About

Production planner for short-batch assembly. Currently exploring fixtures and workshop projects. Working around an ageing control cabinet; planning a 19-week trial before making a decision.

FixturesWorkshop projects

Conversations

O

The fixture holds nominal shape. What happens after release?

OliverCarter0972 · 6 points · Applications & integration · 31 Aug 2026
17replies
L

Universal Robots UR5e: Separating fit-up, restraint and final inspection

LeahAllen0321 · 8 points · Applications & integration · 30 Aug 2026
6replies
C

Our weldment looks aligned until it comes out of the fixture - preparing robotic welding of gusseted brackets

ChenChen1138 · 3 points · Applications & integration · 25 Aug 2026
21replies
A

a fabricated gusseted mounting bracket moves after release in our old inspection notes (Universal Robots UR5e)

AnikaAllen0334 · 19 points · Applications & integration · 8 Aug 2026
1replies
A

A robotic welding project review: Separating fit-up, restraint and final inspection

AnikaAllen0334 · 32 points · Applications & integration · 5 Aug 2026
1replies
A

Still separating the stages in our FR10 bracket records

AnikaAllen0334 · 12 points · Applications & integration · 30 Jul 2026
4replies
R

The bracket drawing fails only after the old restraint is removed

RosaCarter0988 · 19 points · Applications & integration · 26 Jul 2026
1replies
A

Our old bracket notes pass restraint and fail release

AnikaAllen0334 · 16 points · Applications & integration · 26 Jul 2026
6replies
A

A small robot fixture station: Is a label enough for this fixture changeover?

AnikaAllen0334 · 19 points · Applications & integration · 14 Jul 2026
0replies
B

What should count as dimensional acceptance after welding?

BrunoBell0626 · 29 points · Applications & integration · 9 Jul 2026
8replies
J

What would justify reusing our old bracket fixture in the FR5 proposal?

JoAbbott0070 · 18 points · Applications & integration · 7 Jul 2026
16replies
A

The fixture holds nominal shape. What happens after release? - planning repeatable welding of bracket assemblies

AishaBaker0518 · 11 points · Applications & integration · 16 May 2026
14replies
A

Our weldment looks aligned until it comes out of the fixture

AnikaAllen0334 · 0 points · Applications & integration · 14 May 2026
1replies
A

Our FR5 handover has no answer for the empty source pocket

AnikaAllen0334 · 8 points · Programming & support · 24 Mar 2026
3replies
A

Our FR10 bracket estimate contains four hours called correction

AnikaAllen0334 · 20 points · Applications & integration · 11 Mar 2026
9replies
A

Our bracket allowance excludes the correction technician

AnikaAllen0334 · 13 points · Applications & integration · 6 Mar 2026
8replies
B

Cannot cost our FR5 bracket fixture while the correction bench is off the clock

BrunoChen1148 · 8 points · Applications & integration · 24 Feb 2026
16replies
A

Our bracket study charges fixture setup to each corrected piece

AishaBaker0518 · 12 points · Applications & integration · 9 Feb 2026
13replies
O

Why does our FR10 bracket estimate treat correction as free?

OwenBarnes0573 · 6 points · Applications & integration · 8 Feb 2026
17replies
S

Which FR5 bracket result belongs to the fixture after its stop was moved?

SamAllen0333 · 34 points · Applications & integration · 31 Jan 2026
11replies