Controls apprentice maintaining a training cell

JaneBennett0771

Jane Bennett

JB
WalesJoined 28 Feb 202574 posts

About

Controls apprentice maintaining a training cell. Currently exploring fixtures and robot comparisons. Working around multiple shifts; planning a 15-week trial before making a decision.

FixturesRobot comparisons

Conversations

A

The restrained bracket note cannot tell me what changed on release

AmaraAli0252 · 6 points · Applications & integration · 21 Aug 2026
17replies
J

Our weldment looks aligned until it comes out of the fixture - planning repeatable welding of bracket assemblies

JaneBennett0771 · 32 points · Applications & integration · 6 Aug 2026
0replies
J

The seller says switch it on; I want a condition check - loading lightweight fixtures

JaneBennett0771 · 25 points · Buying robots from China · 4 Aug 2026
19replies
J

Seller has gone quiet over our setup manual mismatch - positioning test pieces on a bench

JaneBennett0771 · 16 points · Buying robots from China · 16 Jul 2026
9replies
J

a steel gusseted bracket assembly moves after release in our old inspection notes (Universal Robots UR5e)

JaneBennett0771 · 8 points · Applications & integration · 13 Jul 2026
2replies
A

Our bracket plan needs the first released check, not only the corrected pass

AnnaAllen0329 · 15 points · Applications & integration · 4 Jul 2026
12replies
E

Did logging stall our UR5e display, or just happen at the same time?

EmmaChan1072 · 14 points · Programming & support · 7 May 2026
14replies
J

Fairino FR5 sometimes answers ping, but the SDK times out (controller availability checking)

JamieAli0208 · 25 points · Fairino robots · 1 May 2026
18replies
O

A welded-bracket fabrication workshop: How do I connect fixture location with released dimensions?

OmarBennett0752 · 19 points · Applications & integration · 24 Apr 2026
2replies
A

Our accessory box won't complete 119 kits (Fairino FR10, repeating lightweight fixture loading jobs)

AlexBrown0907 · 27 points · Buying advice · 17 Apr 2026
9replies
O

Our UR5e startup sends the bracket request a second time

OscarAli0184 · 4 points · Programming & support · 16 Apr 2026
21replies
J

Should request receipt and loading-area availability be separate interface events?

JaneBennett0771 · 35 points · Programming & support · 1 Mar 2026
0replies
M

The bracket's final pass belongs to a different drawing revision

MinaAli0250 · 9 points · Applications & integration · 21 Feb 2026
11replies
J

I can't let our FR10 helper treat an unknown result as an unsent job

JoelBowen · 6 points · Programming & support · 25 Jan 2026
11replies
J

What assessment should precede powering our impact-damaged FR10 delivery?

JoAdams0157 · 2 points · Buying robots from China · 7 Jan 2026
16replies
J

Which bracket measurement should replace our clamped inspection sketch?

JaneBennett0771 · 30 points · Applications & integration · 1 Jan 2026
1replies
N

Cannot budget FR5 bracket correction from a final-pass stamp

NinaBrown0936 · 8 points · Applications & integration · 5 Dec 2025
1replies
A

How should I challenge this FR10 vacuum demo with our taped cartons?

AlistairBlair · 11 points · Applications & integration · 3 Dec 2025
12replies
L

our cover comparison has plenty of rejects and hardly any ordinary parts

LucaBaker0439 · 15 points · Programming & support · 23 Nov 2025
20replies
V

Bracket release readings missing from the fixture proposal

VictorAllen0272 · 13 points · Applications & integration · 2 Sept 2025
17replies