Quality measurement technician

LucaBarnes0526

Luca Barnes

LB
NetherlandsJoined 7 Dec 2024323 posts

About

Quality measurement technician. Currently exploring palletising and spare parts. Working around inconsistent part presentation; planning a 7-week trial before making a decision.

PalletisingSpare parts

Conversations

E

A packaged-products warehouse: Fairino FR10 pallet plan: support and tool access need the same review

EllaAbbott0033 · 7 points · Applications & integration · 3 Sept 2026
13replies
J

Support asked for more information. Which information? (Universal Robots UR5e)

JasperBrooks0812 · 22 points · Buying robots from China · 29 Aug 2026
4replies
R

Unidentifiable FR10 film leaves my agreed pad demonstration unfulfilled

RebeccaBennett0778 · 21 points · Buying advice · 24 Aug 2026
21replies
T

Forty-seven days and the supplied FR10 guide still depicts a different panel

TobyBarnes0579 · 20 points · Buying robots from China · 23 Aug 2026
21replies
A

A small finished-goods dispatch area: How do I assess a tidy pattern with questionable support?

AmyBrooks0815 · 9 points · Applications & integration · 14 Aug 2026
14replies
R

Fairino FR10: Our example images keep turning shiny patches into defects

RobinAdams0164 · 24 points · Programming & support · 8 Aug 2026
13replies
L

The listing says inspected. I need something more useful. (Fairino FR10, parts tray loading)

LouisBrown0920 · 12 points · Buying advice · 4 Aug 2026
3replies
R

A workshop packing department: Universal Robots UR5e pallet plan: support and tool access need the same review

RobinArcher0425 · 27 points · Applications & integration · 3 Aug 2026
1replies
H

FR10 dispatch pattern needs more than a preferred box direction

HarishAli0228 · 10 points · Applications & integration · 30 Jul 2026
11replies
A

Why does rotating our boxes count as a finished pallet design?

AdamCasey · 14 points · Applications & integration · 26 Jul 2026
10replies
J

How do I connect fixture location with released dimensions? (preparing robotic welding of gusseted brackets)

JackBennett0776 · 38 points · Applications & integration · 24 Jul 2026
18replies
N

What should I inspect before reteaching fixture-to-tray transfer? (Fairino FR10)

NinaBrooks0849 · 18 points · General robotics · 18 Jul 2026
12replies
C

How do I document a configuration discrepancy without modifying the arm? (Fairino FR5)

ClaraArcher0350 · 32 points · Buying advice · 15 Jul 2026
3replies
A

Handling a filled sample bag: where should our stopping point be? (Fairino FR5, packing tray filling)

AlexBarnes0559 · 9 points · Applications & integration · 12 Jul 2026
9replies
L

Which drawings would connect carton support with gripper access? - planning alternating carton layers on a pallet

LucaBarnes0526 · 9 points · Applications & integration · 11 Jul 2026
3replies
C

Our open machine door is missing from the layout

ClaraCarter0959 · 31 points · Fairino robots · 9 Jul 2026
14replies
L

The label-facing carton pattern still needs its support drawn underneath

LucyBennett0741 · 25 points · Applications & integration · 6 Jul 2026
6replies
N

Cannot compare FR5 pocket-filling totals while the surrounding work keeps changing

NoahBarnes0542 · 10 points · Buying advice · 5 Jul 2026
14replies
V

Why does the guide show connections our delivered UR5e interface does not have?

VictorBarnes0533 · 28 points · Buying robots from China · 3 Jul 2026
17replies
T

What does an empty pocket mean in the FR5 job I handed over?

TobyBrooks0840 · 27 points · Programming & support · 3 Jul 2026
19replies