Small-firm purchasing coordinator

OliverChen1146

Oliver Chen

OC
MidlandsJoined 25 Dec 2024152 posts

About

Small-firm purchasing coordinator. Currently exploring workshop projects and vision inspection. Working around a strict maintenance budget; planning a 20-week trial before making a decision.

Workshop projectsVision inspection

Conversations

O

How do I ask for a useful status on returned the tool interface module? (Fairino FR5)

OmarBaker0491 · 23 points · Buying robots from China · 27 Aug 2026
6replies
T

My FR5 faceplate folder calls a travelling streak a scratch

Tess_Chambers · 13 points · Programming & support · 23 Aug 2026
17replies
A

My FR5 spare kit needs its own answer, not another next-shipment reply

AnnaBrooks0851 · 38 points · Buying advice · 22 Aug 2026
21replies
B

Our bezel scratches travel when the camera presentation changes

BrunoArcher0365 · 31 points · Programming & support · 20 Aug 2026
15replies
W

Why does the rebuilt FR5 laptop reject an argument that the old laptop accepts?

WillBrooks0835 · 28 points · Fairino robots · 19 Aug 2026
2replies
M

sixty-six fixture kits ordered, fewer locating blocks in the sealed box

MeiBaker0516 · 19 points · Buying advice · 19 Aug 2026
3replies
O

The UR5e panel report stops at a seal, before stack separation or fixture delivery

OmarBaker0491 · 39 points · Applications & integration · 18 Aug 2026
11replies
L

Bright streaks move when we present the part differently - checking cosmetic metal surfaces with a fixed camera

LeoAdams0101 · 28 points · Programming & support · 3 Aug 2026
4replies
D

A small assembly handling cell: The tray looks fixed, but the grip looks crooked

DineshBarnes0560 · 7 points · General robotics · 1 Aug 2026
8replies
F

Who reviews support and withdrawal on my UR5e dispatch pattern?

FionaChen1195 · 21 points · Applications & integration · 27 Jul 2026
1replies
T

A robot-presented camera station: What counts as a confirmed defect on a reflective surface?

ThomasBaker0451 · 8 points · Programming & support · 20 Jul 2026
2replies
B

Can this reach sketch support an arm choice? (machine fixture loading)

BenAllen0283 · 29 points · Fairino robots · 9 Jul 2026
5replies
I

I cannot select FR5 fixture exchange from another tool-free doorway sketch

IsaacChan1129 · 28 points · Fairino robots · 4 Jul 2026
17replies
S

Why are our faceplate labels more certain than the inspection?

SaraAdams0113 · 8 points · Programming & support · 16 Jun 2026
21replies
O

My easy UR5e setup was waiting for me when I arrived

OliverChen1146 · 29 points · Reviews & comparisons · 16 Jun 2026
5replies
E

My UR5e review credited me with a setup waiting when I arrived

ElliotArcher0422 · 9 points · Reviews & comparisons · 13 Jun 2026
1replies
M

Delivered UR5e adapter differs from the one in our sample trial

MeiBell0690 · 28 points · Applications & integration · 13 Jun 2026
14replies
A

The FR10 price omits preparation for our 139 connector kits

AnilBrown0897 · 14 points · Buying advice · 10 Jun 2026
15replies
G

One crate arrived; the rest of the order has no tracking

GraceCarter1016 · 24 points · Buying advice · 6 Jun 2026
2replies
K

A low-volume product packing room: What should I do with costs nobody can price yet?

KaiBennett0715 · 35 points · Buying advice · 18 May 2026
1replies