Mobile-robot fleet coordinator

RaviBell0650

Ravi Bell

RB
South East EnglandJoined 17 May 2025112 posts

About

Mobile-robot fleet coordinator. Currently exploring fairino robots and welding cells. Working around mixed supplier documentation; planning a 11-week trial before making a decision.

Fairino robotsWelding cells

Conversations

N

Fairino FR5 pallet plan: support and tool access need the same review - planning alternating carton layers on a pallet

NoahBrooks0803 · 30 points · Applications & integration · 31 Aug 2026
10replies
L

Can't assign a retained FR10 completion just because we reconnected

LucyBaker0480 · 8 points · Applications & integration · 28 Aug 2026
10replies
J

Can we make these Fairino FR10 proposals comparable? - packing tray loading

JoAllen0331 · 25 points · Buying advice · 26 Aug 2026
4replies
A

I cannot hand over UR5e inspection from an unidentified screenshot set

AaronBennett0697 · 21 points · General robotics · 22 Aug 2026
8replies
L

UR5e controller-area arrival damage, no power applied

LouisChen1181 · 4 points · Buying robots from China · 16 Aug 2026
2replies
R

Reconciling retained job state without resending work (Universal Robots UR5e, inspection completion tracking)

RobinAdams0164 · 21 points · Applications & integration · 13 Aug 2026
15replies
N

The layer pattern fits, but some cartons sit over gaps (Fairino FR5, planning alternating carton layers on a pallet)

NaomiAbbott0071 · 12 points · Applications & integration · 6 Aug 2026
11replies
F

Our 24-housing report counts reinspection as another accepted housing

FarahBell0678 · 18 points · Applications & integration · 30 Jul 2026
20replies
I

Can this delivered UR5e interface meet the fixture drawing we agreed?

ImranArcher0392 · 13 points · Buying advice · 28 Jul 2026
17replies
O

How do I assess a tidy pattern with questionable support? (Fairino FR10)

OmarBarnes0578 · 34 points · Applications & integration · 25 Jul 2026
14replies
N

Sorting restart state before running 22 (Fairino FR10)

NinaArcher0414 · 19 points · Programming & support · 24 Jul 2026
10replies
F

A small machine-tending project: Two suppliers, two meanings of ready

FelixBrooks0806 · 16 points · Programming & support · 22 Jul 2026
1replies
R

Fairino FR5: Sorting restart state before running 154

RaviBell0650 · 25 points · Programming & support · 13 Jul 2026
13replies
R

What load did these FR5 quotes assess besides my housing?

RaviBell0650 · 18 points · Buying advice · 24 Jun 2026
1replies
N

Should I separate our UR5e spare-filter shortage from the tray-loading project?

NaomiArcher0419 · 32 points · Buying advice · 22 Jun 2026
12replies
R

Can I judge UR5e torch access from a line beside a clamp?

RaviBell0650 · 11 points · Applications & integration · 12 Jun 2026
5replies
L

The rotated cartons put their strongest supports over nothing

LucyBennett0741 · 29 points · Applications & integration · 10 Jun 2026
15replies
R

Fairino FR10: Seller counts pieces; I ordered matched kits

RaviBell0650 · 33 points · Buying advice · 28 May 2026
1replies
Y

A fixture inspection station: How much of Fairino FR10's interface should I mock?

YasminChan1050 · 26 points · Programming & support · 23 May 2026
16replies
R

Our monitor counts a retained PLC signal twice (Fairino FR10)

RaviBell0650 · 17 points · Applications & integration · 12 May 2026
12replies