Laboratory workflow manager

SarahCarter1024

Sarah Carter

SC
ScotlandJoined 6 Dec 2025111 posts

About

Laboratory workflow manager. Currently exploring palletising and fixtures. Working around limited floor space; planning a 10-week trial before making a decision.

PalletisingFixtures

Conversations

M

our UR5e tooling offers have weighed the housing and forgotten the assembly

MiaAli0209 · 19 points · Buying advice · 16 Jun 2026
8replies
F

How do I separate sleeve length variation from seating variation?

FarahAllen0330 · 24 points · Applications & integration · 9 Jun 2026
8replies
L

Our chuck-loading plan has a measurement problem (preparing a lathe blank-loading sequence)

LeahBell0669 · 33 points · Applications & integration · 7 Jun 2026
18replies
M

How much work have I left out of handling a rigid connector housing? (Fairino FR10)

MinaAdams0163 · 11 points · Buying advice · 1 Jun 2026
5replies
B

Which old measurements can actually guide our fixture review? - defining dimensional control for bracket welding

BethAdams0150 · 16 points · Applications & integration · 30 May 2026
2replies
O

What should count as dimensional acceptance after welding?

OmarAllen0317 · 27 points · Applications & integration · 30 May 2026
3replies
S

Separating fit-up, restraint and final inspection

SarahCarter1024 · 35 points · Applications & integration · 30 May 2026
3replies
J

Several SDK copies and no note of the working one (Fairino FR10, controller status collection)

JoBell0679 · 21 points · Fairino robots · 22 May 2026
1replies
C

UR5e reporting test passes with the read removed

ChenBarnes0529 · 1 points · Programming & support · 10 May 2026
7replies
C

A welded-bracket fabrication workshop: How do I connect fixture location with released dimensions?

ClaraAli0176 · 32 points · Applications & integration · 4 May 2026
17replies
C

Our accessory box won't complete 54 kits (Fairino FR10, setting up repeat tray loading jobs)

CallumBaker0447 · 14 points · Buying advice · 30 Apr 2026
11replies
S

What should count as dimensional acceptance after welding? - defining dimensional control for bracket welding

SarahCarter1024 · 19 points · Applications & integration · 26 Apr 2026
0replies
D

Can this alternating pattern support the load it arranges? (stacking packed cartons onto dispatch pallets)

DineshBaker0473 · 26 points · Applications & integration · 22 Apr 2026
10replies
A

I cannot cost our FR10 bracket correction from a final pass alone

AdaBarnes0564 · 2 points · Applications & integration · 18 Apr 2026
16replies
T

What should count as dimensional acceptance after welding?

TobyBrooks0840 · 20 points · Applications & integration · 13 Apr 2026
1replies
L

Our UR5e budget buys hardware and borrows my colleague

LuisBarnes0608 · 33 points · Buying advice · 5 Apr 2026
2replies
S

Our FR5 bracket estimate borrows acceptance from the correction bench

SarahCarter1024 · 21 points · Applications & integration · 4 Apr 2026
9replies
A

Why does our UR5e carton section have support the lower layer doesn't?

Ash_Briggs · 26 points · Applications & integration · 23 Mar 2026
15replies
B

Our FR5 housing quotes use one part mass for two quite different tools

BrunoAdams0104 · 8 points · Buying advice · 23 Mar 2026
17replies
C

The faster UR5e spacer demo begins after the tray work is done

ClaraBrooks0785 · 9 points · Buying advice · 22 Mar 2026
1replies