Laboratory workflow manager

SarahCarter1024

Sarah Carter

SC
ScotlandJoined 6 Dec 2025111 posts

About

Laboratory workflow manager. Currently exploring palletising and fixtures. Working around limited floor space; planning a 10-week trial before making a decision.

PalletisingFixtures

Conversations

D

What is another FR5 housing pickup nudge actually compensating for?

DineshBell0647 · 37 points · General robotics · 24 Aug 2026
8replies
M

The FR10 layer turns carton supports towards empty space

MeiBarnes0603 · 30 points · Applications & integration · 23 Aug 2026
3replies
O

same UR5e layer revision needed for bearing and finger space

OscarChen1141 · 17 points · Applications & integration · 22 Aug 2026
12replies
R

the UR5e bracket sketch reaches the seam only with a line for a torch

RobinBrown0947 · 18 points · Applications & integration · 18 Aug 2026
1replies
S

Returned UR5e tool module delivered, but nobody confirms service intake

SaraBrown0896 · 27 points · Buying robots from China · 18 Aug 2026
16replies
C

A paused UR5e sleeve loader gives support little to distinguish

CalebAllen0319 · 14 points · Buying robots from China · 17 Aug 2026
2replies
S

I do not want the new welding cell inheriting a correction nobody can explain

SarahCarter1024 · 37 points · Applications & integration · 16 Aug 2026
9replies
J

A request pulse disappears between polls (Fairino FR10, part inspection)

JuliaAli0239 · 11 points · Applications & integration · 8 Aug 2026
1replies
R

A workshop test cell: What does 'inspected' mean on this refurbished Fairino FR10?

RaviArcher0389 · 14 points · Buying advice · 7 Aug 2026
8replies
M

Our carton has a preferred support direction. The pattern rotates it. - stacking packed cartons onto dispatch pallets

MayaBrown0910 · 1 points · Applications & integration · 3 Aug 2026
8replies
O

Different blank projections, no blank dimensions on our sheet

OscarBrooks0793 · 19 points · Applications & integration · 1 Aug 2026
10replies
N

Which job owns the completion after reconnect? (Universal Robots UR5e)

NadiaArcher0378 · 23 points · Applications & integration · 21 Jul 2026
2replies
E

The tidy tray isn't the one in our workshop - sorted tray loading

ElenaBennett0775 · 28 points · Buying advice · 20 Jul 2026
6replies
R

What should I ask suppliers for beyond a payload total?

RebeccaBrown0952 · 6 points · Buying advice · 10 Jul 2026
10replies
I

FR5 tool-interface suffix differs from our confirmed fixture configuration

IsaacAbbott0085 · 8 points · Buying advice · 7 Jul 2026
3replies
R

Which bracket correction belongs in my FR10 process estimate?

RobinAllen0338 · 6 points · Applications & integration · 6 Jul 2026
19replies
N

fr5 case layers need bearing regions behind the arrows

NoahBrooks0803 · 21 points · Applications & integration · 3 Jul 2026
11replies
M

Cannot approve the FR5 pattern while support and release are separate pictures

MichaelCarr · 29 points · Applications & integration · 29 Jun 2026
20replies
J

refurbished ur5e price is clear, inspection scope is not

JasperBaker0464 · 20 points · Buying advice · 27 Jun 2026
3replies
E

UR5e housing-unload ticket needs the event behind the phone clip

ElliotBrooks0857 · 25 points · Buying robots from China · 26 Jun 2026
4replies