Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,733discussions

D

Fairino FR5: How should I review support and separation for thin panels?

DineshBell0647 · 36 points · Applications & integration · 25 Aug 2026
9replies
V

What should packaging approve for stacking a labeled dispatch carton? - palletising sealed product cartons

VictorAbbott0011 · 33 points · Applications & integration · 25 Aug 2026
2replies
M

Which job owns the completion after reconnect? - fixture-check bookkeeping

MinaAbbott0076 · 11 points · Applications & integration · 25 Aug 2026
16replies
C

Our weldment looks aligned until it comes out of the fixture - preparing robotic welding of gusseted brackets

ChenChen1138 · 3 points · Applications & integration · 25 Aug 2026
21replies
R

Old high completion becomes another plate in our UR5e bookkeeping

ReeceBennett0732 · 37 points · Applications & integration · 25 Aug 2026
7replies
S

smooth demo board is not my taped UR5e carton batch

SofiaCarter0978 · 19 points · Applications & integration · 25 Aug 2026
11replies
M

our FR10 housing insert looks reversible and too much like the next family

MeiBaker0516 · 1 points · Applications & integration · 25 Aug 2026
8replies
J

I cannot accept our UR5e rotated cartons from the outline drawing alone

JaneAbbott0075 · 15 points · Applications & integration · 25 Aug 2026
17replies
F

The first sleeve runs improved; the replacement tray still missed

FarahChen1200 · 13 points · Applications & integration · 25 Aug 2026
4replies
L

Our 140-housing plan is not nearly finished just because the FR10 counter says so

LeoArcher0362 · 13 points · Applications & integration · 25 Aug 2026
16replies
R

Why is our FR10 carton review still built around the smooth sample?

ReeceBennett0732 · 10 points · Applications & integration · 25 Aug 2026
21replies
Z

Our UR5e bracket proposal still lacks a measured starting condition

ZaraAbbott0047 · 6 points · Applications & integration · 25 Aug 2026
4replies
L

FR5 dispatch cartons fit the layer but their support regions may not

LouisAdams0137 · 10 points · Applications & integration · 25 Aug 2026
4replies
M

Which released bracket belongs to our aligned-in-fixture note?

MayaBarnes0562 · 10 points · Applications & integration · 25 Aug 2026
0replies
R

The UR5e bracket estimate assumes the correction that our records never explain

ReeceAdams0123 · 28 points · Applications & integration · 25 Aug 2026
20replies
H

I cannot accept these rotated component cases above the pallet gaps

HazelBarnes0571 · 30 points · Applications & integration · 25 Aug 2026
0replies
M

Can our FR5 carton review compare support and release without assuming the gaps are harmless?

MayaBrown0910 · 5 points · Applications & integration · 25 Aug 2026
6replies
M

what would let this FR5 bracket review separate correction from fixture performance?

MinaCarter1033 · 19 points · Applications & integration · 25 Aug 2026
1replies
Y

What can I claim about the FR5 locator after the replacement-tray miss?

YasminChen1137 · 25 points · Applications & integration · 25 Aug 2026
13replies
D

Why does our nearly finished FR10 housing total include reviewed retries?

DanielAli0217 · 37 points · Applications & integration · 25 Aug 2026
20replies