Research software developer entering industrial integration

EmmaAdams0115

Emma Adams

EA
South East EnglandJoined 25 Dec 202458 posts

About

Research software developer entering industrial integration. Currently exploring fixtures and fairino robots. Working around limited floor space; planning a 5-week trial before making a decision.

FixturesFairino robots

Conversations

E

Universal Robots UR5e: The fixture holds nominal shape. What happens after release?

EllaChan1077 · 9 points · Applications & integration · 2 Sept 2026
20replies
S

Planning for 82, judging from mismatched demos - tray-to-tray transfer

SaraBarnes0548 · 9 points · Buying advice · 31 Aug 2026
17replies
E

Fairino FR5: The fixture holds nominal shape. What happens after release?

ElenaCarter1036 · 16 points · Applications & integration · 31 Aug 2026
21replies
T

Prepared handling station: Our Universal Robots UR5e arm arrived; the crate for the controller package didn't

TobyBarnes0579 · 36 points · Buying robots from China · 30 Aug 2026
11replies
J

Which old measurements can actually guide our fixture review? (planning repeatable welding of bracket assemblies)

JonasBaker0459 · 36 points · Applications & integration · 13 Aug 2026
10replies
D

My Fairino FR10 arrived without its controller (transferring lightweight housings)

DineshAbbott0038 · 1 points · Buying advice · 8 Aug 2026
18replies
N

I cannot select bracket locating from an unexplained correction history

NiamhCasey · 15 points · Applications & integration · 1 Aug 2026
13replies
Z

How do I trace the missing controller and the tool wiring adapter? - placing assembly inserts

ZaraChen1178 · 27 points · Buying advice · 19 Jul 2026
14replies
A

How do I get our delivered FR10 bracket compared with the confirmed drawing?

AnilBarnes0549 · 37 points · Buying advice · 13 Jun 2026
5replies
R

Separating fit-up, restraint and final inspection

RobinAllen0338 · 23 points · Applications & integration · 29 Apr 2026
19replies
M

Before we add restraint to a fixture we don't fully understand

MeiBrooks0864 · 31 points · Applications & integration · 23 Apr 2026
9replies
N

Our UR5e pendant has vanished between delivery and service intake

NinaAllen0327 · 9 points · Buying robots from China · 10 Apr 2026
18replies
C

The bracket passes a different check after its correction

CarlaAli0227 · 33 points · Applications & integration · 20 Mar 2026
2replies
D

two bracket checks share one handwritten number

DavidCarter1041 · 16 points · Applications & integration · 3 Mar 2026
17replies
E

our fr5 report gives a bracket another acceptance after its retry

EmmaAdams0115 · 9 points · Applications & integration · 1 Feb 2026
12replies
H

FR5 panel guide with a connection we do not have

HarishCarter1011 · 5 points · Buying robots from China · 25 Nov 2025
11replies
V

Bracket release readings missing from the fixture proposal

VictorAllen0272 · 13 points · Applications & integration · 2 Sept 2025
17replies
E

bracket fixture proposal built around the corrected sample

EmmaAdams0115 · 26 points · Applications & integration · 24 Aug 2025
7replies
A

Cannot choose a UR5e bracket fixture from the final averages

AdaAllen0303 · 26 points · Applications & integration · 20 Aug 2025
10replies
T

Which bracket angle belongs on our FR5 planning sheet?

TobyArcher0405 · 23 points · Applications & integration · 10 Aug 2025
11replies