Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,710discussions

Z

These FR5 dispatch cartons turn their supports into gaps

ZaraCarter1004 · 33 points · Applications & integration · 21 Aug 2026
11replies
I

Which packed-carton revision belongs in our UR5e layer review?

IsaacBarnes0607 · 14 points · Applications & integration · 21 Aug 2026
6replies
L

angle bracket rocks in the proposed inspection nest

LouisChen1181 · 9 points · Applications & integration · 21 Aug 2026
1replies
J

the FR5 carton count fits while the support question remains blank

JackArcher0428 · 15 points · Applications & integration · 21 Aug 2026
18replies
A

our FR10 case layout turns the loaded side across a gap

AnnaCarter1025 · 17 points · Applications & integration · 21 Aug 2026
17replies
O

our 48-housing total is counting inspections instead of accepted housings

OwenAli0225 · 24 points · Applications & integration · 21 Aug 2026
16replies
D

The FR10 bag motion works; the preparation job keeps growing

DarcyChambers · 26 points · Applications & integration · 20 Aug 2026
1replies
R

The sleeve locator helped until the tray changed

RebeccaAbbott0082 · 31 points · Applications & integration · 20 Aug 2026
0replies
E

Our bracket nest has several contacts and no consistent seat

EllaAdams0120 · 26 points · Applications & integration · 20 Aug 2026
21replies
N

The panel seal report never counts the sheets

NinaAdams0153 · 22 points · Applications & integration · 20 Aug 2026
20replies
A

I need the FR10 bracket history to show when alignment was measured

AdaAli0216 · 22 points · Applications & integration · 20 Aug 2026
1replies
M

FR5 alternating cartons fit the pallet but not their support direction

MinaBrown0946 · 38 points · Applications & integration · 20 Aug 2026
20replies
H

The UR5e dispatch pattern needs a bearing view at the rotated boxes

HarishAli0228 · 6 points · Applications & integration · 20 Aug 2026
3replies
J

Our UR5e request pulse is brief, but the ownership gap is the bigger handover problem

JasperBrooks0812 · 8 points · Applications & integration · 20 Aug 2026
19replies
A

UR5e contact pads changed between our inspection-piece trial and delivery

AmaraAllen0339 · 26 points · Applications & integration · 20 Aug 2026
10replies
F

The FR10 chuck-loading worksheet gives me projection without the blank length

FionaAli0238 · 26 points · Applications & integration · 20 Aug 2026
10replies
I

The UR5e bracket drawing contains every seam but almost none of the torch

IsaacAbbott0085 · 36 points · Applications & integration · 20 Aug 2026
13replies
J

Our FR5 inspection request disappears between observations and nobody owns the clearing rule

JamieBennett0730 · 22 points · Applications & integration · 20 Aug 2026
10replies
T

What supports the turned dispatch cartons before I accept this FR5 layer?

TobyAbbott0057 · 9 points · Applications & integration · 20 Aug 2026
20replies
R

The UR5e bracket handover must not inherit an unexplained correction instruction

ReeceBennett0732 · 13 points · Applications & integration · 20 Aug 2026
5replies