Research software developer entering industrial integration

WillBrooks0835

Will Brooks

WB
NetherlandsJoined 27 May 2026126 posts

About

Research software developer entering industrial integration. Currently exploring machine tending and robot comparisons. Working around no spare production machine; planning a 20-week trial before making a decision.

Machine tendingRobot comparisons

Conversations

W

Fairino FR10: Our open machine door is missing from the layout

WillBrooks0835 · 40 points · Fairino robots · 16 Jul 2026
8replies
W

Planning for 89, judging from mismatched demos (Universal Robots UR5e)

WillBrooks0835 · 18 points · Buying advice · 15 Jul 2026
7replies
T

Enough reach, incomplete drawing (machining fixture exchange)

TheoChen1193 · 12 points · Fairino robots · 15 Jul 2026
16replies
W

A working ping hasn't fixed our read-only check (controller availability checking)

WillBrooks0835 · 31 points · Fairino robots · 14 Jul 2026
8replies
W

I've put a lot into this cell and may need to stop (Fairino FR10, filled pouch transfer)

WillBrooks0835 · 22 points · Applications & integration · 14 Jul 2026
17replies
O

Fairino FR10: Does our machine-tending layout actually fit the complete tool?

OwenArcher0399 · 12 points · Fairino robots · 11 Jul 2026
15replies
P

A subcontract lathe department: Same signal direction, different events

PavelAllen0266 · 24 points · Programming & support · 10 Jul 2026
7replies
W

A compact machining workshop: The reach sketch leaves out our machine door and gripper

WillBrooks0835 · 28 points · Fairino robots · 10 Jul 2026
9replies
J

Cannot narrow our FR5 unloading stop from the video I sent

JessCarr · 38 points · Buying robots from China · 1 Jul 2026
8replies
W

What should assess the FR5 enclosure damage before power is applied?

WillBrooks0835 · 34 points · Buying robots from China · 29 Jun 2026
1replies
W

Which complete FR5 tool states belong in our steel-blank exchange review?

WillBrooks0835 · 24 points · Fairino robots · 27 Jun 2026
5replies
L

What detail makes an FR10 blank-removal envelope credible?

LeoAli0188 · 9 points · Fairino robots · 21 Jun 2026
3replies
E

Why does our FR5 identity read time out when the workshop laptop can sometimes ping?

ElenaArcher0427 · 7 points · Fairino robots · 21 Jun 2026
17replies
W

What complete-tool evidence belongs in our eighteen-blank FR5 access check?

WillBrooks0835 · 27 points · Fairino robots · 20 Jun 2026
2replies
W

What remains to assess after we name the missing FR10 tool geometry?

WillBrooks0835 · 21 points · Fairino robots · 17 Jun 2026
7replies
W

What geometry is missing from our FR5 aluminium-blank loading decision?

WillBrooks0835 · 33 points · Fairino robots · 16 Jun 2026
12replies
W

Can the complete FR10 gripper withdraw past our open machine door?

WillBrooks0835 · 39 points · Fairino robots · 9 Jun 2026
21replies
W

A supervised machine tending bay: What should we measure before choosing Fairino FR5?

WillBrooks0835 · 25 points · Fairino robots · 3 Jun 2026
2replies
W

Our open machine door is missing from the layout (machine fixture unloading)

WillBrooks0835 · 33 points · Fairino robots · 1 Jun 2026
2replies
W

Where would you start with gradual pickup drift? (Universal Robots UR5e, tray unloading)

WillBrooks0835 · 27 points · General robotics · 29 May 2026
0replies